Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 37 results ...

Abdelhady, I A I (2013) A new business process model for enhancing BIM implementation in architectural design, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Ackerman, P J, Jr. (2014) Condition assessment, indices, and risk-based decision-making for public school infrastructure management, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Albassami, A A (2014) A framework for international commercialization of innovative products in residential construction: A case of structural insulated panels (SIPs) in the United States and Saudi Arabia, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Carr, P G (2000) An investigation of the relationship between personality traits and performance for engineering and architectural professionals providing design services to the building sector of the construction industry, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Charoenvisal, K (2013) A BIM interoperable web-based dss for vegetated roofing system selection, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Chen, C (2007) Soft computing-based life-cycle cost analysis tools for transportation infrastructure management, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Chen, Q (2007) An object model framework for interface management in building information models, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Comu, S (2013) Examining the impact of facilitation on the performance of global project networks collaborating in virtual workspaces, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

  • Type: Thesis
  • Keywords: culture; effectiveness; efficiency; collaboration; globalization; joint venture; outsourcing; visualization; experiment
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/1513239976
  • Abstract:
    Globalization impacts the Architecture, Engineering and Construction (AEC) industry; customers in the AEC industry are seeking lower costs, faster construction schedules and higher quality services. In order to keep up with the changing demand and to stay competitive in the global AEC industry, firms are forming joint ventures and outsourcing design and services work. As a result, these new trends in the AEC industry require the collaboration of widely dispersed and diverse project workers and companies. Accordingly, it becomes increasingly important to understand the impact of diversity on performance. In this sense, the initial aim of this study was to find empirical evidence on how differences in national culture and language may affect performance in Global Project Networks (GPNs). According to the results of the first experiment comparing the performance of multi-cultural versus mono-cultural simulated project networks over time, I found cultural and linguistic diversity to have a negative impact on initial performance. However, culturally and linguistically diverse project networks studied achieved better adaptation performance that has long term advantages. Even though GPNs have long term performance benefits, bringing the widely dispersed project participants together is costly. Therefore, firms are seeking ways to employ collaboration technologies to bring together the project participants. Little research exists to examine how to increase the efficiency of GPNs that collaborate using technologies such as virtual workspaces to perform design work. In order to examine collaboration in GPNs utilizing virtual workspaces, I conducted two experiments. In the first study, I investigated the formation and the maintenance of Transactive Memory System (TMSs) and cohesive subgroups as a proxy for performance in two facilitated and two non-facilitated global virtual project networks. I found a negative impact on collaboration effectiveness when process facilitators engaged in content facilitation in virtual project networks, which restricts the establishment of TMSs. The findings of the first study revealed inappropriate ways of facilitating GPNs collaborating in virtual workspaces, which motivated the second study. In the second experiment, I observed two global and two domestic virtual project networks that were appropriately facilitated. I examined the interactions between network members in order to identify whether significant differences between the collaboration approaches of global and domestic virtual project networks exist. Facilitators were utilized more frequently in global networks, particularly in the early stages of collaboration. Boundary spanning visualization technologies within the virtual workspace were also utilized more frequently by the global network members; however, this was due more to the spatial richness of the task than the maturity of the collaboration. The overall findings have significant implications in improving the effectiveness of global project network collaborations in virtual workspaces.

Giustozzi, F (2012) Life cycle assessment of sustainable road pavements: Carbon footprinting and multi-attribute analysis, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Gross, M E (2010) Aligning public-private partnership contracts with public objectives for transportation infrastructure, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Hildreth, J C (2003) The use of short-interval GPS data in construction operations analysis, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Johnston, B A (2012) Characterizing virtual prototype constructability programming for the pictographic instruction of procedure, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Jung, Y (2009) An approach to organizational intelligence management (a framework for analyzing organizational intelligence within the construction process), Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Kim, J S (1995) Reliability-based design of a retaining wall, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Kim, K (2003) A resource-constrained CPM (RCPM) scheduling and control technique with multiple calendars, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Kim, S (1990) Development of risk assessment decision support system for hazardous materials movement, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Kim, W (1996) A systems approach to transportation infrastructure management: Development of a highway management system for the Virginia DOT, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Lucko, G (2003) A statistical analysis and model of the residual value of different types of heavy construction equipment, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Lytle, A M (2011) A framework for object recognition in construction using building information modeling and high frame rate three-dimensional imaging, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

McCoy, A P (2008) Commercialization for innovative products in the residential construction industry, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Mitchell, Z W, Jr. (1998) A statistical analysis of construction equipment repair costs using field data and the cumulative cost model, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Novak, V M (2012) Managing sustainability value in design: A systems approach, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Park, B (2002) Development of a virtual reality excavator simulator: A mathematical model of excavator digging and a calculation methodology, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Pinero, J C (2003) A framework for monitoring performance-based road maintenance, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Pishdad-Bozorgi, P (2012) Case-based study and analysis of integrated project delivery (IPD) approach and trust-building attributes, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Platt, R T (1998) Development of a ready-to-assemble construction system, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Prateapusanond, A (2004) A comprehensive practice of total float pre-allocation and management for the application of a CPM-based construction contract, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Quagraine, V K (2007) New strategies to improve the management capacity of contractors for labor-based methods in road rehabilitation in Ghana, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Sands, K S, II (2014) Ethics education and its relationship to undergraduate construction students' professional ethical sensitivity, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Shiratuddin, M F (2009) Framework for context-aware information processing for design review in a virtual environment, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Shoghli, O (2014) A decision support system for multi-objective multi-asset roadway asset management (DSRAM), Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Taiebat, M (2011) Tuning up BIM for safety analysis proposing modeling logics for application of BIM in DfS, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Thabet, W Y (1992) A space-constrained resource-constrained scheduling system for multi-story buildings, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Thompson, R M (2006) An investigation of change to key provisions in the AIA A201 and its impact on perceptions of the value-added benefit of the design professional during construction, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Tiwari, R (2015) A decision-support framework for design of non-residential net-zero energy buildings, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Tucker, R R (2014) Influence of individual perceptions on engineering team performance within design-build infrastructure projects, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.

Williams, R C (2008) The development of mathematical models for preliminary prediction of highway construction duration, Unpublished PhD Thesis, , Virginia Polytechnic Institute and State University.